Tour of the “Im Zelg” residential complex in Uster

13. Nov 2025

Experience the groundbreaking residential development “Im Zelg” in Uster: five apartment buildings featuring 164 modern rental units constructed using innovative timber-frame technology. Thanks to TS3 technology and efficient prefabrication, the first apartments were ready for occupancy as early as March 2025. Discover the project during an exclusive tour!

Bird's-eye view at Zelg Uster
Bird's-eye view at Zelg Uster

The “Im Zelg” residential development is being built in Uster, Canton of Zurich, featuring five apartment buildings and 164 rental units. For sustainability reasons, the investor subsequently decided to construct the buildings—originally planned as masonry structures—entirely using timber construction. Thanks to the collaboration between Rhomberg Bau AG, Renggli AG, and Timber Structures 3.0 AG, the project was successfully redesigned on schedule despite its advanced stage of development. TS3 technology enables a statically two-axially braced timber structure, allowing the rooms to be designed without visible beams. The five buildings are nearly identical and logically structured, making them ideally suited for serial production due to the repetition effect. Thanks to the high degree of prefabrication in timber system construction, the construction time can be shortened, which consequently has a positive impact on costs. The first two buildings were ready for occupancy in March 2025, and the apartments are already fully leased today. The remaining buildings will be ready for occupancy in fall 2025 and spring 2026.

We invite you to visit this exciting project. Take a tour of the site with our experts and learn fascinating details about the project and the specifics of timber construction. The site is an excellent opportunity to take a look inside the completed apartment buildings while also viewing the buildings still in the shell construction phase.

We look forward to welcoming you in Uster.
Timber Structures 3.0 AG in collaboration with Rhomberg Bau AG and Renggli AG

Project Overview

Investor
UBS Sima (UBS Fund Management (Switzerland) AG)

Architecture
Bednar Steffen Architekten AG

General contractor
Rhomberg AG

Timber Construction Engineering
Renggli AG with Timbatec Holzbauingenieure Schweiz AG

Timber system construction
Renggli AG with TS3 ceiling elements

Construction years
2024 to 2026

Buildings 5 and 7: Occupancy in March 2025
Buildings 9 and 11: Occupancy in October 2025
Building 13: Occupancy in June 2026

Use
5 apartment buildings with a total of 164 rental units

Program

Registration

Morning sessionContent
9:30 a.m.Guests arrive
10:00Welcome & Group Assignment
Followed byTour of the “Im Zelg” residential complex in small groups
11:30 a.m.Catering & Networking
1:00 p.m.End of the event

Please use this form to register for the tour:

Registration Form

The event is currently fully booked. You are still welcome to register so we can add you to the waiting list and, if possible, schedule another tour event.

Important Information

  • Please note that the shell construction tour will take place on a construction site. Please wear appropriate footwear. We will provide you with a hard hat and a high-visibility vest. Due to the cold weather, we recommend wearing warm clothing (unheated rooms).
  • The number of participants is limited to three people per company. This restriction allows different companies to participate in the event, as we have only a limited number of spots available. We will contact you if your company exceeds the participant limit.
  • Do not climb onto the scaffolding. Participants are responsible for their own insurance.


Getting Here

Address: Zelgstrasse, 8610 Uster

The “Im Zelg” residential complex is easily accessible by both private and public transportation. We recommend traveling by public transit.

Traveling by public transit
The residential complex is about a 10-minute walk from Uster train station. Alternatively, take bus line 816 from Uster train station to the “Uster, Will” bus stop. The residential complex is about a 2-minute walk from the bus stop.

Traveling by car
Parking is available within a 5- to 10-minute walk. Follow the on-site signage.

Contact person

Timber Structures 3.0 AG | Muttenzerstrasse 107 | 4133 Pratteln
Sven Bill | svnbllts3bz | +41 58 255 42 03

Privacy notice
This website uses external components that can be used to collect data about your behavior. Read more about this in our privacy policy.